Goods that are transferred to another warehouse will be recorded in the Transfer Masuk tab in the Gudang menu, Barang Masuk submenu.
To receive the inbound transfer, follow the steps below!
- The first step, click the Gudang menu, then Barang Masuk, then click Transfer Masuk, click Terima.You can receive the total amount transferred or partially.
- On the Penerimaan Transfer Barang form that appears, click Terima Transfer.
- Goods that have been received will be recorded as Selesai or Completed and will automatically moved the Penerimaan Barang tab.
How to Putaway the Received Goods
- After the received goods moved the Penerimaan Barang tab, tick the check box next to the number column to select the received goods, then click Penempatan and select Manual.
- Scan the NIK /Email of the staff in charge of this process, to record the identity, then click OK .If you use Default Staff, you don’t need to scan the staff‘s NIK/Email. The Dikerjakan Oleh field will be filled automatically.
- After that, the item will automatically go to the Putaway tab. On the Putaway tab, you will see an overall view of the received goods that will be stored or putted away into the shelf.
- Click the Belum Mulai tab, select the order you want to process by clicking the check box next to each item number, then click the Cetak button at the top.
- Later a new page will appear containing the Laporan Putaway or Putaway Report in PDF form that you can print. The document must be filled with the Rack Code manually. In addition, rack code filling can also be done through Jubelio.If the goods to be placed already have a special rack allocation. The dedicated rack will appear in the Rekomendasi Rak or rack recommendation column in the putaway report.
Rack code that shown in Rekomendasi Rak column would be prioritized in the putaway process.
- After that, return to the Penempatan tab, sort the items to be placed, then click Mulai
- The Penempatan Barang form will appear. Scan the rack code and SKU.
Or manually fill in the SKU in the Barang column, the quantity of goods in the Qty column, and the rack code in the Kode Rak The form will be automatically saved.
- Items that have been completed in the placement stage will appear on the Selesai tab with the Progres Penempatan bar fully filled.